Can You Use SPC on Machined Parts Made in Lots of a Few Hundred?

Short answer

SPC on machined parts made in lots of a few hundred is statistical process control applied to a supplier whose runs are short, stop between lots and restart with a new setup, so the long unbroken stream of subgroups that textbook control charts assume never exists. The short answer: yes, but not with the textbook chart per lot. Chart only the key features, use individual-value charts or deviation-from-target charts that carry across lots, and report capability cumulatively over several lots with the sample count stated.

By Saola Manufacturing engineering team · Published · Updated

Engineering guidance for quality and sourcing teams. Your customer, industry or contract may require a specific method; follow it where it does.

This guide is for a quality engineer who has been asked to require Cpk reporting from a supplier that makes a part in lots of a few hundred to a few thousand parts, about once a month. It explains why the standard control chart fits badly, lists the options that do work, and gives the wording to put in a quality agreement. It does not set a required Cpk value; that depends on your part and your risk.

On this page

Why does the textbook control chart struggle with small lots?

Because it needs many in-control subgroups to set trustworthy limits, and a lot-based supplier produces a few short runs separated by restarts. Limits built from too little data do not behave the way the chart assumes.

The NIST/SEMATECH handbook quotes Shewhart's rule of thumb for setting up an X-bar chart: a sequence of not less than twenty-five samples of size four that are in control (NIST, variables control charts). The same page warns that when limits are not computed from a large amount of data, the actual properties might be quite different from what is assumed.

A monthly lot breaks both halves of that. The count is short: a run of a few hundred parts gives few subgroups, and sampling four parts at a time uses up a large fraction of the lot. The stream is also interrupted: each restart brings a new setup, new tool offsets, possibly a new material heat lot and a different operator, so the variation between lots can be larger than the variation within one. A chart that restarts its limits for every lot learns nothing from the last one, and the limits it draws from a few points are loose in unpredictable ways.

The design of SPC goes back to high-volume production, and a 2024 Durham University thesis on low-volume SPC notes that methods for low-volume settings have been adapted since the 1970s but that a comprehensive guideline covering all short-run cases is still missing (Medina-Garcia, Durham University). That is an honest picture of the field: there are workable tools, but no single method that fits every lot size, so the agreement with the supplier has to say which one is used.

Which SPC options work when each lot is small?

Four are practical: an individuals chart on key features, deviation-from-target charts pooled across lots, a cumulative capability figure over several lots, and the short-run techniques in ISO 7870-8. Pick by how many parts you measure per lot and whether the same feature recurs.

The table below compares them. None replaces process control at the machine; each is a way to see drift using the little data a short run produces.

SPC options for short production runs · per NIST/SEMATECH Handbook sections 6.3.2.2 and 6.1.6 (accessed 2026) and ISO 7870-8:2017 as summarized in a 2024 Durham University thesis
OptionWhat it doesFits whenWatch for
Individuals and moving-range chartPlots single measurements in production order; moving range of consecutive readings estimates the spreadOne or a few measurements per interval, key features, one part numberNeeds enough points in sequence; sensitive to measurement noise
Deviation-from-target chartPlots measured minus target so different features or part numbers share one chartSame process makes several similar parts or featuresPooled features must have comparable spread, or scale them first
Cumulative capability over several lotsPools readings across lots into one Cpk with the count statedSame part runs repeatedly and chart shows it stableA drifting process makes the pooled number meaningless
ISO 7870-8 short-run chartingStandardized deviation-from-target approach for sample size oneShort runs and small mixed batchesDesigned primarily for one-off quantities per the Durham thesis; other lot sizes need judgment

How does an individuals chart work with one measurement at a time?

It plots each measurement in the order the parts were made and uses the difference between consecutive readings, the moving range, to estimate the process spread. Limits sit three sigma either side of the center line.

NIST describes the individuals chart for sample size one: the moving range of two successive observations measures the variability, and the control limits are the average plus or minus three times the average moving range divided by 1.128, the constant for pairs. The page also says the average can be replaced by a standard or target when one is available (NIST, individuals control charts).

In practice, this means measuring a feature on the first part after setup and then at fixed intervals through the lot, and recording each reading in sequence with the lot number, machine and setup. Because the chart is built on single readings, the measurement system matters more than it does for averaged subgroups: gauge noise shows up directly as chart noise. The fixed intervals matter too, because readings taken only when an operator feels like it will hide drift.

The practical point for a monthly supplier is where the chart lives. Keep one chart per key feature and keep adding the next lot's readings to it instead of starting a fresh chart each time. After a few lots, the chart has enough points to say something, which no single lot could do alone.

What is deviation from target, and how does ISO 7870-8 use it?

Deviation from target is each measurement minus the target value for that feature, so features or part numbers with different nominal sizes can be plotted on one chart. ISO 7870-8 builds on this idea for short runs and small mixed batches.

The Durham thesis summarizes the standard this way: it addresses deviation from target rather than individual values, it is designed primarily for one-off quantities, and it applies where each sample size is one. For other production volumes it recommends seeking specialist advice, which the author considers an incomplete answer, and the thesis compares the standard with Q charts, CUSUM, EWMA and moving-average methods as alternatives (Durham thesis). Treat ISO 7870-8:2017 as a vocabulary and starting method, not as a complete recipe for lots of a few hundred.

For machined parts, deviation from target is most useful in two cases. First, one machine runs several part numbers with a similar bore or turned diameter, and you want one chart for the process rather than one chart per part. Second, the same part runs in lots too small to build limits on, so the pooled chart accumulates data across lots. Both depend on the features having comparable spread; if one has a tight tolerance and another a loose one, scale the deviations by tolerance or by the feature's own spread before pooling, and say so in the agreement.

The thesis also notes that current low-volume approaches often produce a large number of charts, which makes the results hard to read and wastes time. Chart the few features that matter, not every dimension on the drawing.

How should a supplier report Cpk when the data come from several lots?

Report it cumulatively across lots, only after the chart shows the process is stable, and state the sample count and lot list next to every number. A Cpk from one small lot is a rough indicator, not a capability.

NIST defines process capability as comparing the output of an in-control process to the specification limits, so a stable chart comes first and the index second. It describes about 50 independent data values as generally large enough for an estimate, says the approximate confidence-limit formulas are valid only when the sample is at least 25, and notes that the variation in capability indices is not negligible (NIST, process capability). A figure built from a few dozen readings from one lot can therefore be off by a wide margin and should be labeled that way.

The cumulative approach reads like this: after each lot, the supplier adds that lot's readings to the running set for the feature, confirms the chart is still stable, and reports Cpk with n and the number of lots. Early reports are labeled preliminary. If a lot shows a shift, the report says so and splits the data before and after the change, since a shifted process breaks the pooling assumption. The difference between short-term Cpk and long-term Ppk is covered in the Cpk versus Ppk guide, and what to do when the number is low is in the guide to improving Cpk.

If the data are not close to normal, which is common for features with a one-sided limit such as flatness or runout, NIST suggests transforming the data or using nonparametric indices. Ask the supplier which was used.

What should the quality agreement say about SPC on small lots?

Name the key features, fix the measurement system, require data to be carried across lots, and say what the supplier does when the chart signals. Without those four, a Cpk requirement turns into a number that cannot be compared month to month.

Key features. List the characteristics that get charted, taken from the drawing's critical dimensions and the control plan, and no others. Say how many per lot, at what interval, and in what order, for example first part after setup, regular intervals, and last part.

Measurement system. State the gauge or CMM program, its resolution and how it is checked, so a change of gauge between lots does not look like a process shift. A gauge that is not clearly better than the tolerance band turns the chart into a record of gauge noise; see the gauge accuracy guide.

Data. Require the raw readings in production order with lot, setup, machine and material heat lot, delivered with each shipment, not a summary figure alone. Require that the chart continues across lots. NIST suggests recalculating limits only when at least 30 more points are available and no known process changes have occurred, so ask the supplier to state when limits were last recalculated and why.

Reaction plan. Define what the supplier does on a signal, such as a run of points on one side of the center line or a trend, even when every part is within tolerance. Chart signals are early warnings; the agreement should say who is told, how fast, and whether the lot is held. The wider set of terms is in the supplier quality agreement guide.

How do you ask for this in an RFQ without over-specifying?

Mark the key features on the drawing, say you expect charted data on those features across lots, and ask the supplier to describe what they can supply. Let the quote answer before the contract demands it.

A request that every dimension carry a Cpk is read by most suppliers as a reason to raise the price or decline. A request that names three or four features and asks how readings will be recorded and shared gets a real answer. Ask also how the supplier handles lot-to-lot change, such as a new heat of material, because that is where small-lot processes shift.

When you send a drawing for CNC turning or CNC milling to Saola, mark the key features and the reporting you expect in the quote request, so the reply can say what data will come with each lot. The same marking tells any supplier what you will check at incoming inspection.

Frequently asked

Is SPC worth doing for a lot of a few hundred parts?

On key features, yes, as long as the chart carries across lots. A single lot rarely gives enough points to set limits, but a chart that accumulates several lots can show drift between lots, which is where small-lot processes usually move.

How many data points do I need before quoting a Cpk?

NIST describes about 50 independent values as generally large enough for a capability estimate and notes that the common confidence-interval approximation needs at least 25. With fewer, report the figure as preliminary and show the count.

Can I just ask for a Cpk on every lot?

You can, but a Cpk from one small lot varies a lot, so a requirement such as "Cpk above a value on every lot" will produce false alarms and arguments. A cumulative figure with the sample count stated is a fairer basis.

Does ISO 7870-8 apply to my parts?

It covers charting techniques for short runs and small mixed batches where the sample size is one. The Durham thesis describes it as designed primarily for one-off quantities, so for recurring lots of a few hundred use it as a method to borrow from and agree the details with your supplier.

What is the difference between this and first article inspection?

First article inspection checks that the process can make a conforming part at the start. SPC watches whether it keeps doing so during and across lots. The first is covered in the first article inspection guide.

Sources

  1. 6.3.2. What are Variables Control Charts?, NIST/SEMATECH e-Handbook of Statistical Methods, National Institute of Standards and Technology, accessed 2026
  2. 6.3.2.2. Individuals Control Charts, NIST/SEMATECH e-Handbook of Statistical Methods, National Institute of Standards and Technology, accessed 2026
  3. 6.1.6. What is Process Capability?, NIST/SEMATECH e-Handbook of Statistical Methods, National Institute of Standards and Technology, accessed 2026
  4. Application of Low Volume Statistical Process Control compared against the methodology proposed by BS ISO 7870-8:2017, V. A. Medina-Garcia, Durham University master's thesis, 2024

Have a drawing for this? Send it for a quote.

STEP or PDF, one part or a whole family. You get a unit price at your volume, the tooling cost, and a short manufacturability note.