ISO 9001 certification in progress RoHS material control Vietnam country-of-origin documentation rfq@saolamfg.comEmail WhatsApp +84 86 501 7914

Guide

How many ASTM B117 salt spray hours should anodized and powder coated aluminum pass?

Short answer

ASTM B117 salt spray is a method for running a closed cabinet full of neutral salt fog, not a pass/fail rating: the exposure hours and the definition of failure for anodized or powder coated aluminum come from the finish specification you cite next to it. A passing result proves that one set of specimens met that specification’s criteria under those cabinet conditions, and it proves much less about your parts, your alloy or your service life than most purchase orders assume.

By Saola Manufacturing engineering team · Published · Updated

This guide is for design and quality engineers who have to put a corrosion number on a drawing for an anodized, chem-filmed or powder coated aluminum part, and for buyers who receive a salt spray report and have to decide whether it means anything. The general limits of a cabinet test, and the white-rust-versus-red-rust logic for zinc on steel, are covered in the guide on zinc plating salt spray hours. Aluminum fails differently, and its specifications grade it differently, so the numbers and the acceptance wording here are not interchangeable with the zinc ones.

On this page

What does an ASTM B117 salt spray test actually measure on coated aluminum?

It measures how a coated specimen looks after a fixed time in salt fog, judged against criteria that the finish specification supplies. On aluminum there is no red rust to wait for, so the criterion is pits on anodize and chem film, and blistering or creep from a scribe on powder coat.

The scope of ASTM B117 states plainly that the practice does not prescribe the type of test specimen, the exposure period or the interpretation of the results. Per ASTM B117, the cabinet atomizes a 5 % sodium chloride solution at a controlled temperature, and that is all the method itself controls. Everything that turns the exposure into a pass or a fail lives in another document.

That matters more on aluminum than on steel. Engineers who learned salt spray on plated steel tend to write “no red rust” or “no base metal corrosion” on an aluminum drawing, and neither phrase has a defined meaning there. Aluminum corrodes by pitting, which shows as small white or gray spots with a tail of corrosion product, and under paint it corrodes by creeping sideways from any break in the film. An acceptance note has to name one of those failure modes and say how much of it is allowed, or the inspector at each end of the shipment will make up a different rule.

How many salt spray hours do the anodize, chem film and powder coat specifications require?

The military anodize and chem film specifications fix the hours and the pit count for you, while powder coat has no general-purpose figure at all. For powder, the hours come from the powder maker’s data sheet or from an architectural coating specification, and the drawing has to supply the grading method.

The table collects the requirements an engineer is most likely to cite. Two points are easy to miss. Hard coat (Type III) has no salt spray requirement unless the order also calls for sealing, as the Type II vs Type III anodize guide explains, so asking for hours on unsealed hard coat asks for something the specification never promised. And the architectural powder figures in the last rows describe coatings built for decades of outdoor exposure on building products; per industry guidance they are reference points for what a premium system can reach, not defaults for an industrial housing.

Salt spray requirements for coated aluminum · typical values per MIL-A-8625F (1993, Amendment 1 2003, paragraphs 3.7.1.2 and 4.5.3), MIL-DTL-5541F (2006, paragraphs 3.6.1 and 4.4.1) and ASTM B117-26a (2026) for the cabinet. AAMA rows are industry guidance for architectural coatings, which grade the scribe per ASTM D1654 and blistering per ASTM D714; confirm against the edition you cite.
Finish and governing documentExposure (hours)What counts as a pass
Chem film, MIL-DTL-5541F Class 1A or Class 3168No more than 5 isolated spots or pits per specimen, none larger than 0.031 in diameter, and no more than 15 across all five specimens; areas within 0.25 in of edges, identification markings and holding points excluded
Anodize, MIL-A-8625F Type I, IB, IC, II, IIB (sealed)336No more than 15 isolated pits, none larger than 0.031 in diameter, in a total of 150 in² from five or more pieces, and no more than 5 in a total of 30 in²; areas within 0.062 in of identification markings, edges and electrode contact marks excluded; tested undyed
Hard anodize, MIL-A-8625F Type IIInone unless sealing is specifiedTested to the same pit criteria only when the order specifies that the coating is sealed (Amendment 1, Table II)
Industrial powder coat, no governing specificationset by the powder data sheet or the drawingMust be written on the drawing: scribe creep per ASTM D1654, blistering per ASTM D714
Architectural powder or paint, AAMA 26043000Scribe creep and blister ratings set in the AAMA document
Architectural powder or paint, AAMA 26054000Scribe creep and blister ratings set in the AAMA document

What does a passing MIL-A-8625 salt spray result really prove about your parts?

It proves that the anodizer’s line was producing a properly sealed coating during the test period, on whatever specimens the specification allowed. It does not prove that your alloy, your geometry or your specific lot would pass.

Read the process control clauses and the gap becomes obvious. Per MIL-A-8625F paragraph 4.3.3.1, process control tests run at least once a month, with no more than 35 days between tests. Per MIL-A-8625F paragraph 4.3.3.2, production parts are to be used where they can be adapted to the test; otherwise the anodizer uses panels, run with a production load whenever possible, and at the supplier’s option those panels are 2024-T3 or whichever alloy made up the largest share of that month’s work. Per paragraph 4.3.3.2.3 as rewritten by Amendment 1, corrosion is tested on undyed, sealed parts or panels, and a panel is at least 3 in wide and 10 in long. Per paragraph 4.5.3.1, the significant surface is inclined 6 degrees from vertical in the cabinet, and per paragraph 3.7.1.2, areas near edges, identification markings and electrode contact marks are excluded from the count.

So a compliant certificate of test can describe an undyed wrought panel, possibly from a different load, rather than your part. 2024-T3 is a high-copper alloy and a demanding one in the cabinet (MIL-DTL-5541F note 6.10 says as much for chem film), so a pass on it is real evidence about the process; the gap is everything that differs from the panel. Your black or colored parts were dyed, and the panel was not. Your part may be a high-silicon die casting, which anodizes to a thinner, patchier film (see anodizing die-cast aluminum). It may have sharp machined edges, which are exactly the areas the count leaves out, or blind holes the seal never fully reached. If the corrosion result matters to your design, ask for one of three things in the PO, in rising order of cost: the anodizer’s current process control report with the panel alloy stated; panels of your alloy run in the same load as your parts; or production parts from your lot tested to the same pit criteria. Seal quality can also be checked directly and faster, since per ASTM B680 an acid dissolution test measures the mass a sealed coating loses, which makes it a faster lot-release check than waiting two weeks for a cabinet. Its scope excludes hard coatings, coatings sealed only in dichromate and coatings given a hydrophobic treatment (ASTM B680 scope).

Why does powder coated aluminum pass or fail on the scribe and pretreatment rather than the hours?

An intact powder film is a barrier, and on a flat face it rarely shows anything in a cabinet. Failures start where the film is broken, at a scribe, an edge or a fastener hole, and how far corrosion creeps from there is decided by the conversion pretreatment under the powder.

That is why a powder coat callout with hours but no scribe is close to meaningless. ASTM D1654 covers scribing coated specimens before exposure and then rating corrosion, blistering and loss of adhesion at the scribe afterward; ASTM D714 rates blister size and frequency against photographic references, and its scope says the permissible degree of blistering must be agreed between purchaser and seller. Your note needs both: whether the panel is scribed, the maximum creep from the scribe, and the minimum blister rating.

The second issue is the failure mode the neutral cabinet is worst at reproducing. On painted aluminum the typical field failure is filiform corrosion, thread-like tunnels that grow under the film from an edge or a scratch in humid air, and continuous salt fog does not drive it well. ASTM G85 sets out modified salt spray tests, including a continuous acetic acid-salt version (Annex A1) and a dilute electrolyte cyclic fog/dry version (Annex A5), while a constant fog never dries the way real service does. Filiform has its own test guide, ASTM D2803, which covers three procedures for whether filiform corrosion will form under an organic coating. If filiform matters to you, say so and name the test rather than asking for more neutral salt fog exposure.

Pretreatment and film build decide the result long before the cabinet does. A conversion coat skipped or contaminated on machined faces, a thin film on edges, or outgassing pinholes over porous casting skin all show up as early creep or blisters. The guide on powder coating die cast aluminum without outgassing covers the pinhole side of that problem.

Is a higher ASTM B117 salt spray number a better specification?

No. Asking for more hours than the finish specification supports does not buy corrosion life; it buys failed first articles, retests and arguments about whose cabinet is right.

Neutral salt fog is a comparative check on a process, not a service-life figure; the zinc plating salt spray guide explains why cabinet hours do not convert to years outdoors. The mistakes that show up most often on aluminum drawings are these:

  • Writing a four-figure hour count on a Type II anodize, when per MIL-A-8625F the requirement is 336 hours to a pit count. Many sealed coatings go further, but nothing obliges the finisher to prove a number the specification does not contain, and dyed or thin coatings may not reach it.
  • Writing “no corrosion” or “no red rust” without a pit count, a creep limit or a blister rating.
  • Leaving out whether test panels are acceptable, of which alloy, and whether they must be dyed like the parts.
  • Ignoring the cure time before test. Per MIL-DTL-5541F paragraph 4.4.1, chem film specimens dry for 24 hours at 60 to 100 °F before exposure, so a lab report should show that the aging step was followed.
  • Mixing ISO 9227 neutral salt spray on one document and ASTM B117 on another. The two cabinets are similar, but they are different documents, so cite one.
  • Treating a salt spray pass as galvanic protection. A coated aluminum part fastened with stainless hardware fails at the joint for reasons the cabinet does not test; see galvanic corrosion between aluminum and stainless.

How should the salt spray requirement read on the drawing or purchase order?

Cite the finish specification with its revision, the test method, the specimen, the grading criterion and the frequency, so that a lab on either side of the shipment would reach the same verdict.

Example note for a sealed Type II anodize on a machined 6061 part:

FINISH: ANODIZE PER MIL-A-8625F, TYPE II, CLASS 2, BLACK, SEALED.
CORROSION: SALT SPRAY PER ASTM B117, ACCEPTANCE PER MIL-A-8625F PARA 3.7.1.2.
SPECIMENS: PANELS OF THE PART ALLOY, DYED AND SEALED, RUN IN THE SAME LOAD AS FIRST ARTICLE;
PROCESS CONTROL REPORT WITH PANEL ALLOY STATED FOR EACH PRODUCTION LOT.

Example note for a powder coated aluminum housing:

FINISH: CONVERSION PRETREAT, POWDER COAT, COLOR PER LIMIT SAMPLE.
CORROSION: SCRIBED PANELS, SAME PRETREAT AND CURE LOT, SALT SPRAY PER ASTM B117,
HOURS PER POWDER DATA SHEET OR AS AGREED IN QUOTE.
ACCEPTANCE: SCRIBE CREEP RATED PER ASTM D1654 AND BLISTERING PER ASTM D714,
MINIMUM RATINGS AS STATED ON THE PURCHASE ORDER.

Notice what is deliberately absent from the powder note: a large hour figure copied from an architectural specification. If you need one, take it from the data sheet of the actual powder and pretreatment, and confirm the coater can run that combination before you freeze the drawing. The first article inspection guide covers where the corrosion result belongs in the first-article package.

What should the RFQ say about salt spray, and what can Saola document?

Put the full corrosion requirement in the RFQ, not after the first lot: specification, hours, grading, specimen type and how often you want a result. Then get the test standard and duration confirmed in writing in the quote.

  • The alloy and how each coated surface is produced: wrought, cast, machined or a mix.
  • The finish specification and revision, type, class and seal.
  • The test method, the exposure, and the grading criterion for pits, creep or blisters.
  • Panels or parts, which alloy, and whether a scribe is required.
  • Frequency: first article only, every lot, or a periodic process control report.
  • Any surfaces to mask, which the masking for anodizing guide explains how to flag.

Saola has anodizing on aluminum and powder coating done by partner plants it manages, on parts machined at its lead CNC plant or sourced as castings and stampings, as listed on the surface finishing page; the quote names where each step is done. That page states that salt-spray results are supplied on request, that the test standard and duration are confirmed in the quote, and that Saola does not claim performance beyond what the test report shows. The quality page lists a salt-spray test result for first article and on request, with the test standard and duration confirmed in the quote, and salt-spray samples are part of the sample approval step before production. If your specification calls for a test standard or a finish outside that menu, the surface finishing page asks you to say so before tooling. For the rest of the package, see how to prepare a machining RFQ, then send the drawing through the quote form.

Frequently asked

Can I convert salt spray hours into years of service?

No. ASTM B117 leaves the interpretation of results to other documents and offers no conversion. Use the hours to check that a process is in control, and use outdoor exposure, cyclic tests or field history to estimate life.

Why did my anodized die casting fail when the anodizer’s panel passed?

The panel was probably a wrought alloy, which MIL-A-8625F allows for process control, and it may not have come from your load. High-silicon casting alloys form a thinner, less uniform oxide that seals less completely, so they pit sooner. If the casting itself must pass, require panels or parts of the casting alloy, or consider whether chem film plus paint suits the part better.

Does Type III hard coat need a salt spray requirement?

Only if it is sealed. MIL-A-8625F leaves Type III unsealed when maximum wear resistance is the aim and requires salt spray only when the order calls for sealing. Sealing costs some abrasion resistance, so decide which property the part actually needs.

Is a dyed anodize held to a different salt spray requirement?

No, and it is not even tested dyed. Since Amendment 1 (2003), MIL-A-8625F paragraph 4.3.3.2.3 says corrosion resistance is determined on undyed, sealed parts or panels, against the same pit criteria. If the dyed finish itself must pass, write dyed and sealed specimens on the PO. Color fading is a separate light fastness requirement, which applies only when the order calls for it.

Should I re-test parts at my own lab after they arrive?

For a critical finish, yes, on retained parts from the lot, graded to the same criteria written on the PO. Agree beforehand which result governs if the two labs disagree, and keep the specimen type identical, since a scribed panel and an unscribed part are not comparable.

Sources

  1. ASTM B117-26a, Standard Practice for Operating Salt Spray (Fog) Apparatus, ASTM International, 2026 (scope 1.2)
  2. MIL-A-8625F, Anodic Coatings for Aluminum and Aluminum Alloys, US Department of Defense, 10 September 1993 (paragraphs 3.7.1.2, 3.8, 4.3.3, 4.5.3)
  3. MIL-A-8625F Amendment 1, US Department of Defense, 15 September 2003 (Table II footnote, paragraph 4.3.3.2.3)
  4. MIL-DTL-5541F, Chemical Conversion Coatings on Aluminum and Aluminum Alloys, US Department of Defense, 11 July 2006 (paragraphs 3.6.1, 4.4.1, 6.10)
  5. ASTM D1654-24, Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments, ASTM International, 2024
  6. ASTM D714-25, Evaluating Degree of Blistering of Paints, ASTM International, 2025
  7. ASTM G85-19, Modified Salt Spray (Fog) Testing, ASTM International, 2019
  8. ASTM D2803-09(2020), Testing Filiform Corrosion Resistance of Organic Coatings on Metal, ASTM International, 2020
  9. ASTM B680-24, Seal Quality of Anodic Coatings on Aluminum by Acid Dissolution, ASTM International, 2024 (scope 1.3)

Have a drawing for this? Send it for a quote.

STEP or PDF, one part or a whole family. You get a unit price at your volume, the tooling cost, and a short manufacturability note.